What can be checked
- Stockpile boundaries
- Surface models
- Changes between surveys
What the team receives
- Volume estimates per pile
- Change reports
What the solution does
Faster surveys
Drone surveys can measure stockpile volumes faster than ground surveys; achievable time and accuracy are assessed for each site.
Safer
Keeps surveyors off unstable stockpiles and away from moving equipment, because measurements are taken from the air.
Reconciliation
Supports inventory reconciliation with regular, comparable volumes.
The operational problem
Stockpile surveys are infrequent, labor-intensive and sometimes require surveyors to walk on unstable piles.
How visual intelligence helps
Drone imagery is used to build surface models, piles are segmented automatically and volumes are calculated and compared over time.
Example visual workflow
- A drone captures the stockyard.
- A surface model is built.
- Piles are segmented and volumes calculated.
- Reports are compared with records.
Illustrative workflow — the actual pipeline is designed for each site during the PoC.
Edge deployment considerations
Processing runs on an Edge computer after the flight or in the Cloud for large sites.
How the solution is built
AI capabilities
The AI tasks this use case combines.
- Counting and Measurement
Counting and measurement convert detections, tracks and masks into quantities — how many objects, how long they stayed, how big they are, how full an area is.
- Semantic Segmentation
Semantic segmentation assigns a class to every pixel of an image — road, floor, water, smoke, crop, background — producing a map of regions rather than individual objects.
Visual inputs
Cameras and imaging that typically supply the video.
- Depth, Stereo and 3D Cameras
Depth cameras measure distance to every point in view, using stereo vision, structured light or time-of-flight.
- Drones & UAVs
Drones capture visual data where fixed cameras cannot reach — long perimeters, large sites, tall structures and remote assets.
Deployment options
General approaches to evaluate, not tested hardware. Specific hardware is selected and validated for each project during the PoC.
- Edge AI Hardware Sizing
Sizing Edge AI hardware means matching compute, memory, power and enclosure to the real workload — the number of streams, resolution, frame rate, models and latency targets — under the site's environmental and installation constraints.
- Edge Deployment Architectures
Edge-first means processing video at or near where it is captured.
- Hybrid Edge + Cloud Architecture
In a hybrid architecture, time-critical video analysis runs at the edge while selected functions — central dashboards, long-term storage, fleet management or model improvement — run in the Cloud.
- Industrial and Ruggedized Edge AI Computers
Industrial Edge AI computers and ruggedized systems house AI-capable processors in enclosures built for factories, vehicles and outdoor sites — wide temperature ranges, vibration, dust and industrial power.
Practical factors to plan for
Real-world results depend as much on the environment and camera setup as on the model.
Site and setup
- Ground control. Accuracy depends on ground control and flight planning.
- Density. Converting volume to tonnage requires material density.
Human review
Surveyors and inventory teams validate estimates and apply density factors.
Limitations & scope
- Accuracy depends on survey conditions.
- Tonnage requires density assumptions.
Proof of Concept
Have a visual AI challenge? Let's prove it.
Share a video of what happens in your environment and describe the outcome you need. We review every request for technical feasibility, then agree the scope of a focused Proof of Concept (PoC) with you.
Example request: “We want monthly volume estimates for 15 aggregate stockpiles from drone surveys.”
Every request is reviewed for technical feasibility. PoC scope, timing and terms are agreed individually.
Related topics
How this page connects to industries, use cases, AI tasks, input sources and deployment options.